The UCKG is committed to providing the best environment to thousands of people who attend our churches. For this reason, we have successively invested in the acquisition of new premises and we are improving the current ones.
The UCKG HelpCentre is buzzing with its recent victory! It will be opening in Hammersmith in just a few months time and this is amazing!
This building was acquired in 2010. As a Listed Build, it required special care and needed a lot of work done to modernize it. The essential works were spread into different phases.
This branch was acquired at the end of 2010, and needed a lot of building work done to it in order to take it from a cinema function setting to a place of worship, according to the UCKG’s standards. Therefore, refurbishment works were divided into two phases.
Phase I works were completed in 2011. Phase II works are in progress, which are – the Children’s Biblical Centre, second auditorium and baptism changing room.
Works at this branch are being carried out at present, which are: structural works to accommodate new floors, Children’s Biblical Centre, main and second auditorium, training centre, baptism pool and changing room.
Works at this branch were divided into different phases: Roof works, Children’s Biblical Centre and baptism changing room.
![]() | London 16° Min: 14 °C Max: 26 °C |
![]() | Luton 15° Min: 13 °C Max: 23 °C |
![]() | Cardiff 12° Min: 13 °C Max: 22 °C |
![]() | Leeds 14° Min: 11 °C Max: 21 °C |
![]() | Manchester 14° Min: 11 °C Max: 19 °C |
![]() | Birmingham 16° Min: 13 °C Max: 22 °C |